[1]
“Re-Design The Filling Room Of The Ship To Change The Function Of Barge To Oil Barge 5000 DWT”., zonalaut, vol. 2, no. 1, pp. 14–19, Mar. 2021, doi: 10.62012/zl.v2i1.13435.