[1]
“Study on the Design and Implementation of BPPT-lock Armored Groin for Sediment Control Structure in Front of Sea Water Intake”, zonalaut, vol. 4, no. 3, pp. 240–247, Nov. 2023, doi: 10.62012/zl.v4i3.28244.