“Study on the Design and Implementation of BPPT-lock Armored Groin for Sediment Control Structure in Front of Sea Water Intake” (2023) Zona Laut Jurnal Inovasi Sains Dan Teknologi Kelautan, 4(3), pp. 240–247. doi:10.62012/zl.v4i3.28244.